Equipped in an Air Ambulance Two Stretcher Configuration
Oceanic Package
Secondary NAV Package
Gross Weight Increase Package – Increased to 16,600 lbs
Pro Line Fusion Integrated Flight Deck
Collins TCAS-4100 TCAS II Traffice Collision Avoidance System
Collins RTA-4112 MultiScan Color Doppler Radar
Gross Weight Increase Package (15,500lb to 16,000lb)
Secondary NAV Package includes: 2nd ADF and 2nd DME
Oceanic Package includes: 2nd GPS & HF Radio System with Selcal
Collins VI-3500 Video Enable Sofware allows RS-170 Video Display in Quarter Window on MFD
L-3 Communications MADRAS 88 Parameter Solid State Digital Flight Data Recorder w/90 Day Underwater Acoustic Beacon (EUROCAE ED-112, FAR 135 and ICAO Annex 6 Type 1A Compliant)
Slick Interior Delete Package: Omits 8 Cabin Chairs, 4 Cabin Tables, Cabin Sidewall Armrests, Cup Holders, Forward Partitions, Forward LH Upright Pyramid Cabinet, Forward RH Magazine Rack, Center LH Pyramid Cabinet, Center RH Pyramid Cabinet and Aft Partition with Sliding Doors.
Color Scheme – Special Mission Grey Package
Headliner/Window Area, Upper and Lower Inset, Rail, Cabin Sidewall, Cockpit Sidewall – Mountain Grey Waypoint Vinyl
Cabin Sidewall – Deleted
Cockpit Curtain – Cloud Grospoint Fabric
Cockpit Floor Covering – Grey Nylon Carpet
Cabin Floor Covering – London Solo Vinyl
Laminate – Deleted
Cockpit Chairs – Pewter Leather
Seat Belts/Harness – Shark Grey
Instrument Panel – Nextel-Suede: Dark Anthracite
Overall White with Red Accents
Detailed 1 Inspection complied with @ 3093.0 hours/May 2024; next due @ 3293.0 hours/May 2026
Detailed 2 Inspection complied with @ 3093.0 hours/May 2024; next due @ 3493.0 hours/May 2026
Detailed 3 Inspection complied with @ 2707.3 hours/October 2023; next due @ 3307.3 hours/October 2025
Detailed 4 Inspection complied with @ 2707.3 hours/October 2023; next due @ 3507.3 hours/October 2025
Landing Gear Overhaul due October 2026/8000 hours
LH and RH Engine Hot Section Inspection complied @ 2320.4 hours
LH and RH Engine Overhaul due @ 3600 hours
LH and RH Propeller Overhaul complied with @ 2900 hours/December 2023; next due @ 5900 hours/July 2028